top of page
Penang 2nd Full bridge2.jpg

Sultan Abdul Halim Mu’adzam Shah Bridge

Also known as Penang Second Bridge, Sultan Abdul Halim Mu’adzam Shah Bridge is a key catalyst of the Northern Corridor Economic Region of Malaysia. Total length of the bridge is 24 km with length over water at 16.9 km. The second longest bridge in Southeast Asia. Officially opened on 1 March 2014.

Contractor : Jambatan Kedua Sdn Bhd (JKSB)

We provide :

High Performance Concrete (G55)

Technical Requirement :

  • ISAT test 0.10ml/m2/s @28days

  • RCPT test max 1000 coulomb @56days

  • Chloride content test max 0.1%

  • Sulphate content test max 4.0%

  • Modulus of elasticity 20-40 Gpa

  • Transport concrete truck mixer by using  barge to the middle of the sea for deck stitching concreting which required 8 hours slump retention

NS EcoCrete

Merdeka 118

Malaysia’s latest iconic mixed-use development features a 118-storey tower which will be the tallest tower in Southeast Asia and the second tallest building in the world upon completion in end 2021. Consisting of a luxury hotel, Southeast Asia’s highest observation deck, approximately 1 million sq. ft. of retail space, three premium residential towers, a 4-acre Linear Park, a café with ‘instagrammable’ views, a childcare centre, and a mosque, this precinct will become a place of celebration for all Malaysians.

Contractor : Samsung C&T Corporation UEM Construction JV Sdn. Bhd.

We provide :

High Performance Concrete (G80)

Technical Requirement :

  • Low temperature concrete (≤ 29.0 ⁰C)

  • Slump retention up to 3 hours

  • Extended Initial Setting Time to 10 hours

High Performance Concrete (G60)

Technical Requirement :

  • Raft foundation continuous big pour

  • UPC supplied approximate 3400m3 within 72 hours of concrete placement temperature (≤ 28.0 ⁰C)

  • Slump retention up to 3 hours

조감도1_Sapura HQ.jpg

PERMATA SAPURA TOWER

This development is a 45-floor Grade A office tower over a multi-level long span podium structure that houses an exhibition space, complete with a 31m deep basement with five levels of car parking and two levels of retail space. Completed in 2020, Permata Sapura stands tall at 252m height and is an exciting real estate addition to Kuala Lumpur.

Contractor : Samsung C&T Corporation

We provide :

High Performance Concrete (G80 & G60)

Technical Requirement :

  • Low temperature concrete (≤ 28.0 ⁰C)

  • Slump retention up to 3 hours

  • Flow concrete to pump up to level 53

  • Early strength requirement for G35 (14 N/mm2 @ 36 hrs)

NS EcoCrete LH + 50% GGBS

Technical Requirement :

  • 3.5 m raft foundation G40 big pour 

  • UPC supplied approximately 3000m3 with 4 hours slump retention

  • Supplied flow concrete to pump up to level 53

SOLARIS PARQ

From the creator of Publika Kuala Lumpur, Solaris Parq is designed to be a mixed development that is the embodiment or urban park living. Upon completion, this project is expected to add to the vibrancy of the Mont'Kiara and Kuala Lumpur vicinity with its exciting residential and retail offerings.

Developer : UEM Sunrise Berhad

We provide :

High Performance Concrete 

(G45)

Technical Requirement :

  • Initial temperature (≤ 30 ⁰C ) for 1.5m transfer slab

  • Slump retention up to 3 hours

  • Peak temperature ≤ 75 ⁰C

NS EcoCrete LH

Elevated 2a.jpg

KVMRT – V8

Klang Valley Mass Rapid Transit (KVMRT) – V8 comprises of 4.6km main line that covers 3 elevated stations in Kajang, Selangor. It includes 1.8 km spur line of southbound and northbound single track spur line viaduct to the Kajang Depot.

Contractor : MMC GAMUDA KVMRT (T) Sdn. Bhd.

We provide :

High Performance Concrete (G40 & G50)

Technical Requirement :

  • Early strength

  • Initial temperature (≤ 30 ⁰C)

  • 15mm & 30mm water penetration

  • 3 hours slump retention

NS EcoCrete LH

50% OPC + 50% GGBS

bottom of page